ANALISIS CVP (COST VOLUME PROFIT) UNTUK PERENCANAAN LABA PADA CV. ZAM-ZAM COLLECTION KABUPATEN JOMBANG

Authors

  • Lailatus Sa’adah Universitas KH. A. Wahab Hasbullah Jombang
  • Indy Asna Azizah Universitas KH. A. Wahab Hasbullah

DOI:

https://doi.org/10.31943/investasi.v9i3.282

Keywords:

Biaya-Volume-Laba, Perencanaan Laba

Abstract

This study aims to determine the calculation of profit planning on CV. Zam-Zam Collection as a whole uses cost-volume-profit analysis (CVP) with reference to the last year, that’s on 2022. The research method with primary data sources and secondary data. From the results of reseacrh in 2022 CV. Zam=Zam managed to sell 10.211 headscarves, earning Rp. 304.447.000. While the variable cost incurred are Rp. 233.780.490. and a fixed fee of Rp. 17.961.250. From the results of these calculations, the contribution margin result is Rp. 70.666.510 and the contribution margin ratio is 23%. The break even point result is IDR 78.092.781 and the BEP unit is 1.150 pcs. Result Margin of Safety of Rp. 226.354.609 with a percentage ratio of 74.35% the operating laverage is 1,34. Based on the calculation results of the cost-volume-profit (CVP) analysis, it shows that CV. Zam-Zam Collection has not yet carried out profit planning, but judging from the profit target with the reality of the profit generated, CV. Zam-Zam Collection has been able to achieve it.

References

Blocher, E., & Chen, K. H. (2004). The ALLTEL Pavilion Case: Strategy and CVP Analysis. Issues in Accounting Education, 19(4). https://doi.org/10.2308/iace.2004.19.4.555

Brigham, & Houston, joel f. (2006). dasar dasar manajemen (10th ed.). salemba empat. http://kin.perpusnas.go.id/DisplayData.aspx?pId=32563&pRegionCode=JIUNMAL&pClientId=111

Budiwibowo, S. (2012). Analisis Estimasi Cost-Volume-Profit (CVP) Dalam Hubungannya Dengan Perencanaan Laba. ASSETS: Jurnal Akuntansi Dan Pendidikan.

Carter, & Usry. (2002). akuntansi biaya jilid 1. Salemba Empat, 578.

Dewi, sylvyah citra, & Lasyono, U. (2019). Pengaruh efisiensi biaya operasional dengan cvp analysis terhadap tercapainya profit pada ud. andri jaya. 1(1), 936–944.

Garrison, R. H., Noreen, W. E., & Brewer, P. C. (2013). Akuntansi Manajerial. In SELEMBA EMPAT (Vol. 7, Issue 6).

Hansen, D. R., & Mowen, M. M. (2009). cost management. Mason, Ohio : : South-Western Cengage Learning, 2009.

Hassanah, A., & Daud, R. M. (2019). Analisis Cost Volume Profit Sebagai Alat Perencanaan Laba (Studi Kasus Pada Umkm Dendeng Sapi Di Banda Aceh). Jurnal Ilmiah Mahasiswa Ekonomi Akuntansi, 4(2), 190–214. https://doi.org/10.24815/jimeka.v4i2.12232

Irawati, S. (2005). Manajemen Keuangan. Pustaka.

Iswara, U. S., & Susanti. (2017). Analisis Cost Volume Profit Sebagai Dasar Perencanaan Laba Yang Diharapkan. Jurnal Riset Akuntansi Keuangan, 2(2), 67–76.

Mulyadi. (2016). Sistem Akuntansi. Sistem Akuntansi.

Palupi, Y., & Wulan, E. R. (2021). Analisis CVP (Cost Volume Profit) Sebagai Dasar Perencanaan Penjualan dan Laba Yang Diharapakan Pada PT. Mayora Indah Tbk. E-Proceeding of Management, 15(2), 552–568.

Prof. Dr. Sugiyono. (2013). Metode Penelitian Kuantitatif Dan Kualitatif Serta R&D. In Alfabeta, CV (Issue April).

Purnomo, H. (2018). Optimasi Profitabilitas Dengan Analisis CVP ( STUDI : UD Buah Segar Seminar Nasional Manajemen Ekonomi Akuntansi ( SENMEA ) 2018- UNPGRI KEDIRI. November.

Rahayu, puji septiani, & Istikhoroh, S. (2019). Efektivitas Cvp Untuk Merealisasikan Perencanaan Laba Home Industri Minuman Tradisional “ NING ’ S ”. 1(1), 1450–1458.

Rahmayani, aris nur, & Mardiyantika, V. (2020). Penerapan Metode CVP (Cost - Volume - Profit) Sebagai Alat Bantu Analisis Perencanaan Laba Dalam Mencapai Target Perusahaan. Peta, 05(0342), 99–116.

Rahmi, F., Sayekti, cyntia dwi, Dahar, R., & Yanti, nino sri purnama. (2023). Analisis Cost Volume Profit (CVP) Sebagai Alat Perencanaan Laba pada UMKM Pempek Palembang MWR. 25(1), 64–71.

Rosianna, C., Winanda, Y., & Kurnia, W. R. (2021). Analysis Of Costs , Volume And Profits Towards Planned Income On Analisis Cost Volume Profit Terhadap Perencanaan Laba UMKM. 1(2), 291–297.

Sa’adah, L. (2019). akuntansi manajemen (1st ed.). FP UNIVERSITAS KH A WAHAB HASBULLAH.

Simon, A., Septiana, T., Suci, R. G., & Riau, U. M. (2020). Analysis Of Cost Volume Profit As A Basic Of Expected Company Profit ( Studi Kasus Sultan ’ S Barbershop ) Perusahaan Yang Diharapkan ( Studi Kasus Sultan ’ S Barbershop ). 1(1), 123–131.

Triana, D. H., Vitriana, N., & Suriyanti, L. H. (2020). Penerapan Analisis CVP Sebagai Alat Perencanaan Laba UD Sukma Jaya : Efektif atau Semu ? 1(April).

Yanto, M. (2020). Penerapan Cost – Volume – Profit (Cvp) Sebagai Dasar Perencanaan Laba Pada Cv. Usaha Bersama Tanjungpinang. Jurnal Dimensi, 9(2), 369–386. https://doi.org/10.33373/dms.v9i2.2547

Downloads

Published

2023-10-30